Design Installation Group - Home page   DIS Group HQ, 42/44 Bath Road, Cheltenham, Gloucestershire, GL53 7HJ, Tel 01242 533120, Fax 01242 221187
Link to home pageGroup ProfileLink to Contact pageQuality EnvironmentalLink to Quality page
Services
Link to Mechanical Services section
Link to Ductwork Systems section
Link to Fire Engineering
DIS Group HQ
All » Case Studies

Marks & Spencer

Store Location: York
Architects: Darnton EGS
Client: Marks & Spencer Plc
Contract Type: Simpson (York) Ltd
Duration: 10 weeks
Following a competitively tendered bid, we successfully secured the M&S Pavement / Parliament Street job, which is situated in the York city centre. This store is renowned for its problematic logistics and according to our Client, it is the second worst in the country logistically. All works were carried out on a live store so a lot of the work was done out of trading hours and was phased. Our works consisted of the following:
New "Hot food on the move"
  • Kitchen extract system
  • VRF Air conditioning installation
  • Water services installation including heat pump boiler
  • Drainage installation (pumped)
  • Plant room installation
  • BMS Controls installation


    New "Large Bakery"
  • Water service and drainage installation


    Other works
  • Complete customer toilets refurbishment
  • New "shop your way" ventilation
  • New window display ventilation
  • Air handling unit modifications / repairs
  • Sales floor above ceiling drainage replacement works


  •  
    building services uk
    © DIS Group Sitemap | Accessibility built by TOP PAGE
    building services uk